Numerical analysis of an over-boarding operation for a subsea template
Subsea templates are normally transported to the installation site on the deck of a crane vessel.After being lifted off from the deck, Model Paint the template is 1) over-boarded from the initial location to the target position by the side of the vessel; 2) lowered through the splash zone; 3) further lowered down to the seabed and 4) finally positi